EIA of a macrophyte wastewater treatment plant for the GCT and TIFERT plants
Baseline, air dispersion modelling, impact matrix, ESMP and stakeholder consultation, in ANPE format.
AHEC has delivered over 500 environmental consulting projects for leading organizations in energy, industry, infrastructure and mega-developments across Saudi Arabia, Tunisia and the wider region.
Projects Successfully Delivered
Major Clients Served
Regulatory Approval Success Rate
Years of Industry Experience







Environmental studies delivered by our Tunis office for industrial, energy and public clients.
Baseline, air dispersion modelling, impact matrix, ESMP and stakeholder consultation, in ANPE format.
Drilling, side-track, produced-water injection and soil remediation EIAs, through to ANPE approval.
Remediation plan review, Basel Convention permits, containment, transport and disposal verification.
Habitat mapping, flora and fauna inventories and critical habitat assessment to World Bank ESS6 and IFC PS6.
2D hydrodynamic model with tide and wind scenarios to design the sediment deposit area.
Bathymetric survey, sediment sampling and analysis, disposal site selection and ESMP.
Alternatives analysis, coastal erosion and sea-level rise, stormwater review and ESMP.
Eco-balance, pollution diagnosis, regulatory compliance check and costed action plan.
Environmental Management Plans for minor modifications
Environmental assessments for medium-impact developments
Comprehensive ESIA for major industrial and infrastructure projects






Dammam, Jubail, Khobar, Ras Al Khair, Al-Khafji
Riyadh, Qiddiya, Diriyah, Sakaka, Al-Hadhen
Yanbu, Rabigh, NEOM, Tabuk
Jazan, Najran, Bisha
Al-Qurayyat, Northern Border Region
Sfax, Bizerte, Monastir, Kasserine, Kebili, El Borma
Our portfolio covers some of the most complex projects in Saudi Arabia and Tunisia, for clients such as Saudi Aramco, SABIC, NEOM, the Tunisian Chemical Group, SITEP and UNOPS.
Tell us about your project and our team will get back to you shortly.